Pin and Wedge

Key features of the concrete formwork pin-and-wedge system: fast, safe, and temporary connection of formwork components such as panels, soldiers, walers, and props.

Functional design allowing easy and rapid assembly and dismantling of the formwork system.

  • Pin: a straight or bent steel rod used for the initial positioning and fixation of components.
  • Wedge: a triangular or trapezoidal steel component used alongside the pin to create a tight and secure connection.

Manufactured from high‑strength steel, offering durability and resistance to pressure and vibration.

Reusable across multiple projects with fast installation and no requirement for special tools.

Pin and wedge systems are among the most widely used accessories in concrete formwork, designed to provide a fast, reliable, and temporary connection between formwork components such as panels, soldiers, walers, and props. These two elements are typically used together and allow quick assembly and dismantling of the formwork system.

  1. Pin: a steel rod with a straight or bent design that is inserted into the holes of formwork panels, soldiers, or props.
    Function: provides primary holding and positional restraint of the connected elements.
  2. Wedge: a steel component with a narrow triangular or trapezoidal shape. After the pin is installed, the wedge is driven in alongside it to fully tighten the connection.
    Material: typically manufactured from hardened steel.

Applications of the pin and wedge system include:
Connecting soldiers to steel formwork panels or walers;
Connecting plumbing or alignment jacks to the structure or formwork;
Use in slab leveling systems and concrete wall formwork;
Rapid formwork assembly and easy dismantling after concrete pouring.

Advantages of using the pin and wedge system include:
High speed of installation and removal;
No need for special tools during installation (typically installed with a hammer);
High resistance to vibration and fresh concrete pressure;
Reusable in multiple construction projects.

Pin and Wedge

Description

In the world of civil engineering and modern construction projects, the stability and safety of concrete structures are of paramount importance. While advanced modular formwork systems form the backbone of these structures, the true strength and reliability of such systems ultimately depend on their smallest connecting components. The Pin and Wedge, despite its seemingly simple appearance, plays a critical and decisive role, bearing the responsibility for the integrity and resistance of the entire formwork system against the immense hydrostatic pressure exerted by fresh concrete. A weak or low-quality connection can lead to catastrophic formwork failure, material waste, project delays, and—most importantly—serious risks to the safety of site personnel.

Zeman Company (Zemanco), with over 35 years of proven experience and as one of the leading manufacturers of concrete formwork and steel scaffolding systems in the Middle East and Central Asia, fully understands this responsibility. Accordingly, we do not treat the pin and wedge as a secondary accessory, but rather as a precise and essential engineered component. By relying on a highly skilled and innovative technical team and utilizing advanced industrial machinery along with fully automated welding robots, we deliver a product that guarantees safety, accuracy, and efficiency in your construction projects.

This page serves as a comprehensive guide, introducing all the technical, practical, and quality aspects of the pin and wedge manufactured by Zeman Company, and clearly demonstrates why choosing our products represents a smart investment in risk reduction and increased project productivity.

What Is a Pin and Wedge and Why Is It Vital in Concrete Formwork?

The pin and wedge is a two-piece mechanical fastening system widely used for the quick and secure connection of
modular steel formwork panels.
Due to its simple design, high installation speed, and exceptional locking strength, this system has become an industry standard in construction projects worldwide. The components of this system include:

  • Pin: This component, typically cylindrical or flat with a machined slot, passes through the punched holes located along the edges of two adjacent formwork panels, keeping them aligned and properly positioned.
  • Wedge: This metal component, featuring a triangular or tapered profile, is inserted into the slot of the pin. When struck with a hammer on its wider end, the wedge moves downward and, due to its tapered geometry, generates increasing pressure on the pin and consequently on the formwork panels. This action creates an extremely tight, play-free connection, firmly locking the panels together as a single unified structure.

The critical importance of this component lies in its ability to ensure the integrity of the entire formwork wall or column. Without strong connections provided by pin and wedge systems, panels may shift, deform, or suddenly open (blowout) under the heavy pressure of fresh concrete. Such failures not only severely compromise the quality of the finished concrete surface, but can also result in complete project shutdowns and significant repair and reconstruction costs.

Many manufacturers consider the simplicity of this product as a sign of low importance and therefore offer it as a low-cost commodity. At Zeman Company, however, we view this simplicity as a reflection of engineering ingenuity and efficiency, while simultaneously emphasizing that flawless execution of this simple design requires highly precise manufacturing processes and rigorous quality control. The difference between an ordinary pin and wedge and a superior product lies in raw material quality, dimensional accuracy, and structural integrity—factors that directly impact the safety and success of your project.

Technical Specifications of Zeman Pin and Wedge

Zeman Company’s commitment to quality is clearly reflected in the precise and transparent technical specifications of our products. Understanding the requirements of engineers and contractors, we manufacture our pin and wedge using premium raw materials and under strict quality standards to ensure maximum performance and durability in demanding job-site conditions.

Manufactured to the Highest Standards Using Zeman’s Advanced Technology

Every pin and wedge produced at Zeman Company is the result of a process where advanced technology and meticulous quality control take precedence. We use ST37-grade steel sheet supplied by Mobarakeh Steel Complex, known for its excellent mechanical properties and high resistance to stress, making it an ideal material for pressure-bearing components.

Unlike traditional manufacturing methods that may result in sharp edges (burrs), inconsistent thickness, or structural weaknesses, Zeman utilizes automated press machines and precision-engineered dies. This approach ensures that every produced piece has uniform dimensions, a smooth surface, and no cutting edges. Such manufacturing precision not only enhances worker safety during installation, but also allows the pin and wedge to fit easily and create a flawless, highly secure connection. This is the true value our investment in advanced machinery delivers to customers: a reliable product with consistent, repeatable performance.

Types of Zeman Pin and Wedge: A Solution for Every Formwork System

Different construction projects require formwork systems with varying specifications. For this reason, Zeman Company manufactures two main types of pin and wedge to comprehensively cover the needs of the construction industry:

Light Pin and Wedge

This model is specifically designed for use with modular formwork panels featuring a 5 cm edge profile. These panels are the most commonly used type in general construction projects. With an approximate weight of 90 grams per set, the light pin and wedge provides an ideal balance between strength and weight, making handling and installation easier for operators.

Heavy Pin and Wedge

This model is designed for heavier-duty applications and for use with modular formwork panels featuring a 6 cm edge profile. Such panels are typically used in projects with greater concrete pouring heights or special structural applications where higher loads are imposed on the formwork system. With larger dimensions and an approximate weight of 125 grams per set, the heavy pin and wedge offers higher load capacity and guarantees a significantly stronger connection.

Selecting the appropriate pin and wedge based on the type of formwork in use is a key principle for ensuring system safety and efficiency. Zeman’s technical experts are always available to provide professional guidance to help you choose the most suitable product for your specific project requirements.

Specification Light Pin & Wedge Heavy Pin & Wedge
Application Modular formwork panels with 5 cm edge Modular formwork panels with 6 cm edge
Material ST37 Steel Sheet (Mobarakeh Steel) ST37 Steel Sheet (Mobarakeh Steel)
Thickness 4 mm / 5 mm 4 mm / 5 mm
Wedge Length Approx. 8.6 cm Approx. 10 cm
Pin Length Approx. 7.1 cm Approx. 8 cm
Approx. Weight per Set Approx. 90 g Approx. 125 g
Standard Packaging 500 sets per bag 500 sets per bag

Key Benefits of Using Zeman Pin and Wedge in Your Projects

Choosing high-quality equipment is a strategic decision that directly affects project time, cost, and final quality. Zeman pin and wedge systems provide tangible advantages that help contractors and site managers achieve their project goals with greater confidence.

Exceptional Speed in Formwork Assembly and Dismantling

Time is a valuable resource in construction projects. The simple and efficient design of the pin and wedge significantly accelerates the assembly and dismantling (stripping) of formwork systems. Unlike bolted connections or complex fastening systems that require multiple tools and additional time, panel connections using pin and wedge can be completed in seconds with just a hammer. This speed translates into reduced labor hours, faster project progress, and ultimately lower overhead costs.

Outstanding Strength and Stability to Prevent Concrete Leakage

One of the main challenges during concrete pouring is preventing cement slurry leakage (bleeding) through panel joints. This phenomenon not only results in an unattractive, porous concrete surface (honeycombing), but also negatively affects concrete strength and durability by altering the water-cement ratio at the surface.

Due to high dimensional accuracy and the use of standard steel thicknesses (4 or 5 mm), Zeman pin and wedge systems create extremely tight, gap-free connections between panels. This strong connection fully compresses the panels against each other, preventing any concrete leakage and resulting in smooth, uniform, high-quality exposed concrete surfaces and structures that meet their full design strength.

Cost Efficiency Through Long Service Life and Reusability

A professional approach to cost evaluation goes beyond the initial purchase price. Although low-quality pin and wedge products may appear cheaper at first glance, they often deform, crack, or corrode quickly due to inferior materials, becoming unusable. In contrast, Zeman pin and wedge products, manufactured from high-quality ST37 steel and engineered design, offer an extended service life and can be reused across multiple projects.

This durability significantly reduces the cost per use and represents a highly economical long-term investment. This is the concept of Total Cost of Ownership, which experienced and professional contractors always consider.

Precision Design for a Seamless and Fully Integrated Connection

The stability of a formwork system depends on proper force distribution throughout the structure. The precise design of Zeman pin and wedge ensures that once installed, there is no looseness or unwanted movement between panels. This integrated connection allows loads imposed by fresh concrete to be evenly distributed across the entire system, preventing stress concentration at critical points. The result is enhanced overall formwork stability, reduced risk of panel deformation, and accurate execution of structural dimensions in full compliance with engineering drawings.

Practical Guide: Proper Use and Quantity Estimation

Zeman Company considers itself not only a manufacturer, but a technical partner to its customers. In this section, practical guidelines are provided for correct usage and accurate estimation of the required number of pin and wedge sets, helping optimize on-site operations.

Step-by-Step Guide to Connecting Panels with Pin and Wedge

  • Panel Alignment: Place two modular formwork panels directly next to each other, ensuring the punched holes on their edges are perfectly aligned.
  • Insert the Pin: Pass the pin through the aligned holes. Zeman’s precise pin design allows this step to be completed smoothly without excessive force.
  • Insert the Wedge: Insert the wedge from the top into the rectangular slot of the pin.
  • Lock the Connection: Using a standard hammer, apply a firm, vertical strike to the wider end of the wedge. This action drives the wedge downward, creating a strong, self-locking connection. Ensure the wedge is fully seated and no play remains in the joint.

How to Estimate the Required Number of Pin and Wedge Sets

Accurately estimating the required quantity prevents delays and unnecessary costs caused by shortages or surplus materials on site. As a general industry guideline, the following rules may be applied:

  • Per Panel Basis: On average, connecting each modular formwork panel to adjacent panels requires approximately 5 to 6 pin and wedge sets.
  • Area Basis: As a broader estimate, approximately 16 pin and wedge sets are required per square meter (m²) of formwork area.

Zeman Technical Tip: Due to job-site conditions and the relatively small size of these components, a certain level of loss is always possible. To prevent work interruptions and ensure sufficient availability, it is recommended to order 5–10% more than the calculated quantity. This preventive approach reflects our deep understanding of real construction challenges and our commitment to uninterrupted project success.

Why Zeman Pin and Wedge Is the Smart Choice for Professionals

In a market full of seemingly similar products, true differentiation lies in manufacturing processes and commitment to quality. Zeman Company’s greatest competitive advantage—which directly translates into the superior quality of our pin and wedge—is extensive investment in automation and robotic manufacturing technology. While many competitors rely on manual or semi-automated processes, our production lines utilize advanced machinery and robotic systems to deliver consistently high quality with repeatable precision.

This technological edge ensures that every pin and wedge leaving the Zeman factory possesses exactly the same technical specifications, strength, and quality as the previous one. Such an approach completely eliminates risks associated with low-quality products, including burrs, inconsistent thickness, weak welds, or substandard materials.

When you choose Zeman pin and wedge, you are not merely purchasing a metal component—you are investing in certainty. Certainty that even the smallest part of your formwork system has been manufactured with the same high standards of quality and precision you expect from our complete formwork and scaffolding systems. This commitment to excellence at every level of production, from the largest structures to the smallest connectors, is the signature of Zeman quality and the reason construction professionals trust us.

Price Inquiry and Direct Purchase from Zeman Factory

At Zeman Company, we believe in transparency in our customer relationships. The price of pin and wedge products, like other steel-based items, fluctuates due to direct dependence on global and domestic steel prices. Therefore, publishing a fixed price on the website cannot accurately reflect real-time and fair market costs.

To receive the most accurate and up-to-date pricing, professional consultation for selecting the appropriate pin and wedge type for your project, and information on wholesale purchase conditions, we invite you to contact our expert sales team directly. Our specialists are ready to review your project requirements and provide the optimal solution at the most competitive possible price. Purchasing directly from the Zeman factory eliminates intermediaries and guarantees receipt of genuine products with the highest quality at the best value.

For price inquiries and order placement, please call +98 912 8441055 or submit your request through the “Contact Us” page.

Conclusion

Although small and simple in appearance, the pin and wedge plays a vital role in ensuring the stability and safety of concrete formwork systems. Choosing a high-quality product from a reputable manufacturer such as Zeman Company means reduced execution risks, faster operations, and long-term economic savings. Zeman’s 35 years of experience and use of advanced manufacturing technology guarantee a level of quality trusted by professionals across the construction industry.

Reviews (0)

Reviews

There are no reviews yet.

Be the first to review “Pin and Wedge”

Your email address will not be published. Required fields are marked *

five + 9 =

Get expert advice

Our sales experts at Zaman are ready to provide guidance and advice before your purchase.