{"id":3095,"date":"2025-12-20T10:25:59","date_gmt":"2025-12-20T06:55:59","guid":{"rendered":"https:\/\/zemanco.com\/%d9%82%db%8c%d9%85%d8%aa-%d9%82%d8%a7%d9%84%d8%a8-%d9%81%d9%84%d8%b2%db%8c-%d8%a8%d8%aa%d9%86\/"},"modified":"2026-02-14T13:27:54","modified_gmt":"2026-02-14T09:57:54","slug":"steel-concrete-formwork-price-list","status":"publish","type":"post","link":"https:\/\/zemanco.com\/en\/steel-concrete-formwork-price-list\/","title":{"rendered":"Steel Concrete Formwork Price List (1404 Update) + Detailed Weight Table"},"content":{"rendered":"<p dir=\"ltr\" style=\"text-align: justify\">In the modern construction industry, cost management is one of the most challenging responsibilities for project managers and contractors. Since <strong>metal concrete formwork<\/strong> is considered one of the core tools in the execution of concrete structures, fluctuations in its price can directly impact the final project budget. With the entry into the year 1404 and the continuous changes in the steel market, having access to a transparent reference for metal concrete formwork prices and knowing the exact weight of each formwork sheet is vital to prevent financial losses.<\/p>\n<p dir=\"ltr\" style=\"text-align: center\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-1645\" src=\"https:\/\/zemanco.com\/wp-content\/themes\/woodmart\/images\/lazy.svg\" data-src=\"https:\/\/zemanco.com\/wp-content\/uploads\/2025\/05\/Modular-metal-formwork-300x300.jpg\" alt=\"Standard modular metal formwork by Zaman Company, ready for delivery to project sites\" width=\"300\" height=\"300\" srcset=\"\" data-srcset=\"https:\/\/zemanco.com\/wp-content\/uploads\/2025\/05\/Modular-metal-formwork-300x300.jpg 300w, https:\/\/zemanco.com\/wp-content\/uploads\/2025\/05\/Modular-metal-formwork-200x200.jpg 200w, https:\/\/zemanco.com\/wp-content\/uploads\/2025\/05\/Modular-metal-formwork-150x150.jpg 150w, https:\/\/zemanco.com\/wp-content\/uploads\/2025\/05\/Modular-metal-formwork-500x500.jpg 500w, https:\/\/zemanco.com\/wp-content\/uploads\/2025\/05\/Modular-metal-formwork-1024x1024.jpg 1024w, https:\/\/zemanco.com\/wp-content\/uploads\/2025\/05\/Modular-metal-formwork-768x768.jpg 768w, https:\/\/zemanco.com\/wp-content\/uploads\/2025\/05\/Modular-metal-formwork.jpg 1100w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/p>\n<p dir=\"ltr\" style=\"text-align: center\"><a href=\"https:\/\/zemanco.com\/%d9%82%d8%a7%d9%84%d8%a8-%d9%81%d9%84%d8%b2%db%8c-%d9%85%d8%af%d9%88%d9%84%d8%a7%d8%b1\/\"><strong>Metal Concrete Formwork<\/strong><\/a><\/p>\n<p dir=\"ltr\" style=\"text-align: justify\">In this comprehensive article by Beton Sazeh Zaman Company, we not only review the latest updated price lists, but also provide standard weight tables, factors affecting pricing, and a guide to distinguishing high-quality formwork from low-quality products. If you are planning a smart purchase, this article is your roadmap.<\/p>\n<h2 dir=\"ltr\">Why Does the Price of Metal Concrete Formwork Fluctuate? (Market Analysis 1404)<\/h2>\n<p dir=\"ltr\" style=\"text-align: justify\">Before examining the figures and numbers, you should understand which factors determine the final amount on your invoice. Unlike many products, the price of metal concrete formwork is not fixed and depends on the following variables:<\/p>\n<p dir=\"ltr\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-2828 size-full\" title=\"The price of metal concrete formwork constantly fluctuates due to its direct dependence on steel sheet prices. Changes in exchange rates, transportation costs, the level of supply and demand in construction projects, labor wages, and production costs also affect the final price. In addition, construction market stagnation or growth and national economic policies can cause temporary increases or decreases in metal concrete formwork prices.\" src=\"https:\/\/zemanco.com\/wp-content\/themes\/woodmart\/images\/lazy.svg\" data-src=\"https:\/\/zemanco.com\/wp-content\/uploads\/2025\/12\/2-2.jpg\" alt=\"Why does the price of metal concrete formwork fluctuate?\" width=\"1920\" height=\"1080\" srcset=\"\" data-srcset=\"https:\/\/zemanco.com\/wp-content\/uploads\/2025\/12\/2-2.jpg 1920w, https:\/\/zemanco.com\/wp-content\/uploads\/2025\/12\/2-2-300x169.jpg 300w, https:\/\/zemanco.com\/wp-content\/uploads\/2025\/12\/2-2-1024x576.jpg 1024w, https:\/\/zemanco.com\/wp-content\/uploads\/2025\/12\/2-2-768x432.jpg 768w, https:\/\/zemanco.com\/wp-content\/uploads\/2025\/12\/2-2-1536x864.jpg 1536w, https:\/\/zemanco.com\/wp-content\/uploads\/2025\/12\/2-2-500x281.jpg 500w, https:\/\/zemanco.com\/wp-content\/uploads\/2025\/12\/2-2-150x84.jpg 150w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/p>\n<h3 dir=\"ltr\">1. Daily Steel Sheet Price (Mobarakeh or Other Brands?)<\/h3>\n<p dir=\"ltr\" style=\"text-align: justify\">The most important factor is the price of black steel sheet (ST37) on the commodity exchange. The best formwork available in the Iranian market is produced using Mobarakeh Steel sheets, which offer both excellent surface smoothness and high tensile strength.<\/p>\n<p dir=\"ltr\" style=\"text-align: justify\"><strong>Zaman Note:<\/strong> Some manufacturers use sheets from \u201cGilan\u201d or \u201cAhvaz\u201d to reduce costs, which may not have the same quality as Mobarakeh sheets. When requesting a price quote, be sure to ask about the sheet brand.<\/p>\n<h3 dir=\"ltr\">2. Sheet Thickness (3 mm or More?)<\/h3>\n<p dir=\"ltr\" style=\"text-align: justify\">Standard formworks are usually manufactured with a 3 mm facing sheet and 5 mm ribs. In addition, the type of connecting components such as <strong>pins and wedges<\/strong>, which are used to fix the formworks together, plays a crucial role in the final structural quality. If weak connections are used, the formworks may open during concreting, causing significant damage.<\/p>\n<p dir=\"ltr\" style=\"text-align: center\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-2384\" src=\"https:\/\/zemanco.com\/wp-content\/themes\/woodmart\/images\/lazy.svg\" data-src=\"https:\/\/zemanco.com\/wp-content\/uploads\/2025\/05\/\u067e\u06cc\u0646-\u0648-\u06af\u0648\u0647-300x300.jpg\" alt=\"Zaman pin and wedge | Safe and reliable connection in concrete formwork systems\" width=\"300\" height=\"300\" srcset=\"\" data-srcset=\"https:\/\/zemanco.com\/wp-content\/uploads\/2025\/05\/\u067e\u06cc\u0646-\u0648-\u06af\u0648\u0647-300x300.jpg 300w, https:\/\/zemanco.com\/wp-content\/uploads\/2025\/05\/\u067e\u06cc\u0646-\u0648-\u06af\u0648\u0647-1024x1024.jpg 1024w, https:\/\/zemanco.com\/wp-content\/uploads\/2025\/05\/\u067e\u06cc\u0646-\u0648-\u06af\u0648\u0647-150x150.jpg 150w, https:\/\/zemanco.com\/wp-content\/uploads\/2025\/05\/\u067e\u06cc\u0646-\u0648-\u06af\u0648\u0647-768x768.jpg 768w, https:\/\/zemanco.com\/wp-content\/uploads\/2025\/05\/\u067e\u06cc\u0646-\u0648-\u06af\u0648\u0647-200x200.jpg 200w, https:\/\/zemanco.com\/wp-content\/uploads\/2025\/05\/\u067e\u06cc\u0646-\u0648-\u06af\u0648\u0647-500x500.jpg 500w, https:\/\/zemanco.com\/wp-content\/uploads\/2025\/05\/\u067e\u06cc\u0646-\u0648-\u06af\u0648\u0647.jpg 1100w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/p>\n<p dir=\"ltr\" style=\"text-align: center\"><a href=\"https:\/\/zemanco.com\/%d9%be%db%8c%d9%86-%d9%88-%da%af%d9%88%d9%87\/\">Purchase Pin and Wedge<\/a><\/p>\n<h3 dir=\"ltr\">3. Edge Type (5 cm Edge or 6 cm Edge)<\/h3>\n<ul dir=\"ltr\">\n<li>5 cm edge formwork: These formworks have a 5 cm edge height and are the most standard type available on the market.<\/li>\n<li>6 cm edge formwork: The edge height is 6 cm, which provides higher strength but also results in greater weight.<br \/>\nObviously, due to higher steel consumption, 6 cm edge formwork is more expensive.<\/li>\n<\/ul>\n<h3 dir=\"ltr\">4. Welding and Manufacturing Quality<\/h3>\n<p dir=\"ltr\" style=\"text-align: justify\">Using CO\u2082 welding instead of conventional electric welding increases production costs, but multiplies the service life of the formwork. All formworks produced by Beton Sazeh Zaman are manufactured using robotic or manual CO\u2082 welding under strict quality control (QC) supervision.<\/p>\n<h2 dir=\"ltr\">Metal Concrete Formwork Weight Table (Standard Reference 1404)<\/h2>\n<p dir=\"ltr\" style=\"text-align: justify\">In the formwork equipment market, pricing is calculated based on weight (kilograms). This means you multiply the unit price per kilogram by the total weight. Therefore, having an accurate weight table helps you verify the correctness of the issued invoice.<\/p>\n<p dir=\"ltr\" style=\"text-align: justify\">(Note: The weights listed below are approximate and calculated based on Zaman\u2019s production standard using a 3 mm facing sheet and 5 mm ribs. A weight tolerance of approximately \u00b15% is normal in metal products.)<\/p>\n<h3 dir=\"ltr\">Table 1: Weight of Modular Formworks (5 cm Edge)<\/h3>\n<table dir=\"ltr\">\n<tbody>\n<tr>\n<td style=\"text-align: center\">Application<\/td>\n<td style=\"text-align: center\">Approximate Weight (kg)<\/td>\n<td style=\"text-align: center\">Formwork Dimensions (cm)<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\">Narrow columns \/ corners<\/td>\n<td style=\"text-align: center\">5.5<\/td>\n<td style=\"text-align: center\">100 \u00d7 10<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\">Column casting<\/td>\n<td>6.8<\/td>\n<td style=\"text-align: center\">100 \u00d7 15<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\">Columns and walls<\/td>\n<td style=\"text-align: center\">7.8<\/td>\n<td style=\"text-align: center\">100 \u00d7 20<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\">Standard wall and column<\/td>\n<td style=\"text-align: center\">10.5<\/td>\n<td style=\"text-align: center\">100 \u00d7 30<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\">Shear walls<\/td>\n<td style=\"text-align: center\">13.5<\/td>\n<td style=\"text-align: center\">100 \u00d7 40<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\">Most commonly used size<\/td>\n<td style=\"text-align: center\">15.5 \u2013 16<\/td>\n<td style=\"text-align: center\">100 \u00d7 50<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\">High-rise projects<\/td>\n<td style=\"text-align: center\">23.5<\/td>\n<td style=\"text-align: center\">150 \u00d7 50<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\">Monolithic wall concreting<\/td>\n<td style=\"text-align: center\">31.0<\/td>\n<td style=\"text-align: center\">200 \u00d7 50<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h3 dir=\"ltr\">Table 2: Weight of External and Internal Corners<\/h3>\n<table dir=\"ltr\">\n<tbody>\n<tr>\n<th style=\"text-align: center\">Corner Type<\/th>\n<th style=\"text-align: center\">Dimensions (cm)<\/th>\n<th style=\"text-align: center\">Approximate Weight (kg)<\/th>\n<\/tr>\n<tr>\n<td style=\"text-align: center\">External corner<\/td>\n<td style=\"text-align: center\">10 \u00d7 10 \u00d7 100<\/td>\n<td style=\"text-align: center\">10.5<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\">External corner<\/td>\n<td style=\"text-align: center\">10 \u00d7 10 \u00d7 150<\/td>\n<td style=\"text-align: center\">15.5<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\">Internal corner<\/td>\n<td style=\"text-align: center\">10 \u00d7 10 \u00d7 100<\/td>\n<td style=\"text-align: center\">8.5<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\">Internal corner<\/td>\n<td style=\"text-align: center\">10 \u00d7 10 \u00d7 150<\/td>\n<td style=\"text-align: center\">12.5<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<div dir=\"ltr\">\n<div><\/div>\n<\/div>\n<h2 dir=\"ltr\">Metal Concrete Formwork Price List (Daily Update)<\/h2>\n<p dir=\"ltr\" style=\"text-align: justify\">Important notice: Due to momentary fluctuations in the steel market, listing fixed prices in the table below may be misleading. However, at Zaman, we have tried to provide an approximate price range to help you estimate your costs.<br \/>\n(To receive the final and real-time price, be sure to contact Zaman\u2019s sales experts.)<\/p>\n<table dir=\"ltr\" style=\"width: 60.0165%\">\n<tbody>\n<tr>\n<th style=\"width: 30.2133%;text-align: center\">Product Name<\/th>\n<th style=\"width: 10.3918%;text-align: center\">Unit<\/th>\n<th style=\"width: 21.6561%;text-align: center\">Price Status<\/th>\n<th style=\"width: 50.9554%;text-align: center\">Estimated Price (Toman\/kg)<\/th>\n<\/tr>\n<tr>\n<td style=\"width: 30.2133%;text-align: center\">5 cm edge metal formwork (Mobarakeh sheet)<\/td>\n<td style=\"width: 10.3918%;text-align: center\">Kilogram<\/td>\n<td style=\"width: 21.6561%;text-align: center\">Available<\/td>\n<td style=\"width: 50.9554%;text-align: center\">Contact us<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 30.2133%;text-align: center\">6 cm edge metal formwork (custom order)<\/td>\n<td style=\"width: 10.3918%;text-align: center\">Kilogram<\/td>\n<td style=\"width: 21.6561%;text-align: center\">Custom production<\/td>\n<td style=\"width: 50.9554%;text-align: center\">Contact us<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 30.2133%;text-align: center\">Circular (round) column formwork<\/td>\n<td style=\"width: 10.3918%;text-align: center\">Kilogram<\/td>\n<td style=\"width: 21.6561%;text-align: center\">Available<\/td>\n<td style=\"width: 50.9554%;text-align: center\">Contact us (10% more expensive than flat formwork)<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 30.2133%;text-align: center\">Formwork corners and angles<\/td>\n<td style=\"width: 10.3918%;text-align: center\">Kilogram<\/td>\n<td style=\"width: 21.6561%;text-align: center\">Available<\/td>\n<td style=\"width: 50.9554%;text-align: center\">Same price as modular formwork<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 30.2133%;text-align: center\">Second-hand formwork (like new)<\/td>\n<td style=\"width: 10.3918%;text-align: center\">Kilogram<\/td>\n<td style=\"width: 21.6561%;text-align: center\">Limited<\/td>\n<td style=\"width: 50.9554%;text-align: center\">Approximately 30% cheaper than new<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<div dir=\"ltr\">\n<div><\/div>\n<\/div>\n<h3 dir=\"ltr\">Formula for Calculating Your Total Invoice Price<\/h3>\n<p dir=\"ltr\">To know exactly how much budget you need to allocate, use the following formula:<\/p>\n<blockquote dir=\"ltr\"><p>(Number of formworks \u00d7 Weight of each formwork) \u00d7 Daily steel price + fabrication labor cost = Final price<\/p><\/blockquote>\n<p dir=\"ltr\">At Zaman Group, by eliminating intermediaries and purchasing sheets directly from the factory, we strive to offer the lowest possible \u201cfabrication labor cost\u201d while maintaining high quality.<\/p>\n<h2 dir=\"ltr\">Should You Buy New or Second-Hand Concrete Formwork? (Economic Review)<\/h2>\n<p dir=\"ltr\">One of the most frequently asked questions by our customers in 1404 is whether purchasing second-hand formwork is economically justified. Let\u2019s review this honestly:<\/p>\n<h3 dir=\"ltr\">Advantages of Second-Hand Formwork<\/h3>\n<ol dir=\"ltr\">\n<li>Lower price: Usually 30% to 40% cheaper than new formwork.<\/li>\n<li>Suitable for short-term projects: If you only need formwork for a small project, it may be justifiable.<\/li>\n<\/ol>\n<h3 dir=\"ltr\">Disadvantages and Hidden Risks<\/h3>\n<ol dir=\"ltr\">\n<li style=\"text-align: justify\"><strong>Deformation and warping:<\/strong> Second-hand formworks are often distorted. This means your concrete surface will not be smooth, and you will later have to pay significant costs for finishing and plastering to cover concrete irregularities.<\/li>\n<li style=\"text-align: justify\"><strong>Reduced safety:<\/strong> The welds of old formworks may have weakened and can fail under pressure during concreting. This issue is especially dangerous in high-rise structures that require heavy <a href=\"\/?product_cat=\u0633\u06cc\u0633\u062a\u0645-\u0647\u0627\u06cc-\u062f\u0627\u0631\u0628\u0633\u062a\">scaffolding systems<\/a> and shoring.<\/li>\n<li>Need for repairs: They often require adjustment and cleaning, which is both costly and time-consuming.<\/li>\n<\/ol>\n<p dir=\"ltr\" style=\"text-align: justify\">Zaman experts\u2019 recommendation: If you are a contractor and intend to use the formwork for many years, be sure to buy new formwork. This is an investment, not an expense. After about five years of use, you can sell new formwork as second-hand at a good price, whereas second-hand formwork, after use, is practically considered scrap.<\/p>\n<p dir=\"ltr\" style=\"text-align: justify\">Cuplock scaffolding is one of the safest and most widely used scaffolding systems in concreting and formwork projects. With fast installation and suitable load-bearing capacity, it is an ideal option for high-rise structures.<\/p>\n<p dir=\"ltr\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-2361 size-medium\" title=\"Cuplock scaffolding. Zaman Company, understanding this great responsibility, has undertaken the specialized production of cuplock scaffolding systems with the highest level of quality and engineering.\" src=\"https:\/\/zemanco.com\/wp-content\/themes\/woodmart\/images\/lazy.svg\" data-src=\"https:\/\/zemanco.com\/wp-content\/uploads\/2025\/05\/\u0641\u0631\u06cc\u0645-\u0636\u0645\u0627\u0646--300x300.jpg\" alt=\"Cuplock scaffolding. Zaman Company, understanding this great responsibility, has undertaken the specialized production of cuplock scaffolding systems with the highest level of quality and engineering.\" width=\"300\" height=\"300\" srcset=\"\" data-srcset=\"https:\/\/zemanco.com\/wp-content\/uploads\/2025\/05\/\u0641\u0631\u06cc\u0645-\u0636\u0645\u0627\u0646--300x300.jpg 300w, https:\/\/zemanco.com\/wp-content\/uploads\/2025\/05\/\u0641\u0631\u06cc\u0645-\u0636\u0645\u0627\u0646--1024x1024.jpg 1024w, https:\/\/zemanco.com\/wp-content\/uploads\/2025\/05\/\u0641\u0631\u06cc\u0645-\u0636\u0645\u0627\u0646--150x150.jpg 150w, https:\/\/zemanco.com\/wp-content\/uploads\/2025\/05\/\u0641\u0631\u06cc\u0645-\u0636\u0645\u0627\u0646--768x768.jpg 768w, https:\/\/zemanco.com\/wp-content\/uploads\/2025\/05\/\u0641\u0631\u06cc\u0645-\u0636\u0645\u0627\u0646--200x200.jpg 200w, https:\/\/zemanco.com\/wp-content\/uploads\/2025\/05\/\u0641\u0631\u06cc\u0645-\u0636\u0645\u0627\u0646--500x500.jpg 500w, https:\/\/zemanco.com\/wp-content\/uploads\/2025\/05\/\u0641\u0631\u06cc\u0645-\u0636\u0645\u0627\u0646-.jpg 1100w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/p>\n<p dir=\"ltr\" style=\"text-align: center\"><a href=\"https:\/\/zemanco.com\/%d8%af%d8%a7%d8%b1%d8%a8%d8%b3%d8%aa-%da%a9%d8%a7%d9%be%d9%84%d8%a7%da%a9-%d9%81%d9%86%d8%ac%d8%a7%d9%86%db%8c\/\">Cuplock Scaffolding<\/a><\/p>\n<p dir=\"ltr\" style=\"text-align: justify\">H-frame scaffolding, with its simple structure and adequate strength, is mostly used in light construction and facade projects and, due to its quick installation, is very cost-effective for short-term works.<\/p>\n<p dir=\"ltr\" style=\"text-align: center\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-2364\" src=\"https:\/\/zemanco.com\/wp-content\/themes\/woodmart\/images\/lazy.svg\" data-src=\"https:\/\/zemanco.com\/wp-content\/uploads\/2025\/05\/\u0641\u0631\u06cc\u0645-\u0636\u0645\u0627\u0646-1-1-300x300.jpg\" alt=\"H-frame scaffolding, also known as H-shaped scaffolding or H shoring, is a heavy-duty modular scaffolding system composed of prefabricated frames in the shape of the Latin letter 'H'.\" width=\"300\" height=\"300\" srcset=\"\" data-srcset=\"https:\/\/zemanco.com\/wp-content\/uploads\/2025\/05\/\u0641\u0631\u06cc\u0645-\u0636\u0645\u0627\u0646-1-1-300x300.jpg 300w, https:\/\/zemanco.com\/wp-content\/uploads\/2025\/05\/\u0641\u0631\u06cc\u0645-\u0636\u0645\u0627\u0646-1-1-1024x1024.jpg 1024w, https:\/\/zemanco.com\/wp-content\/uploads\/2025\/05\/\u0641\u0631\u06cc\u0645-\u0636\u0645\u0627\u0646-1-1-150x150.jpg 150w, https:\/\/zemanco.com\/wp-content\/uploads\/2025\/05\/\u0641\u0631\u06cc\u0645-\u0636\u0645\u0627\u0646-1-1-768x768.jpg 768w, https:\/\/zemanco.com\/wp-content\/uploads\/2025\/05\/\u0641\u0631\u06cc\u0645-\u0636\u0645\u0627\u0646-1-1-200x200.jpg 200w, https:\/\/zemanco.com\/wp-content\/uploads\/2025\/05\/\u0641\u0631\u06cc\u0645-\u0636\u0645\u0627\u0646-1-1-500x500.jpg 500w, https:\/\/zemanco.com\/wp-content\/uploads\/2025\/05\/\u0641\u0631\u06cc\u0645-\u0636\u0645\u0627\u0646-1-1.jpg 1100w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/p>\n<p dir=\"ltr\" style=\"text-align: center\"><a href=\"https:\/\/zemanco.com\/%d8%af%d8%a7%d8%b1%d8%a8%d8%b3%d8%aa-h-%d9%81%d8%b1%db%8c%d9%85\/\">H-Frame Scaffolding<\/a><\/p>\n<p dir=\"ltr\" style=\"text-align: justify\">Triangular shoring is one of the most reliable systems for supporting concrete slabs and heavy decks, and it plays a key role in ensuring the safety of slab formwork in construction projects.<\/p>\n<p dir=\"ltr\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-1701 size-medium\" title=\"Triangular scaffolding, also known as triangular shoring, as the most advanced load-bearing scaffolding system, provides a decisive response to engineers\u2019 needs for higher load capacity, greater safety, and faster execution speed.\" src=\"https:\/\/zemanco.com\/wp-content\/themes\/woodmart\/images\/lazy.svg\" data-src=\"https:\/\/zemanco.com\/wp-content\/uploads\/2025\/05\/Triangular-Omega-Scaffolding2-300x300.jpg\" alt=\"Triangular scaffolding, also known as triangular shoring, as the most advanced load-bearing scaffolding system, provides a decisive response to engineers\u2019 needs for higher load capacity, greater safety, and faster execution speed.\" width=\"300\" height=\"300\" srcset=\"\" data-srcset=\"https:\/\/zemanco.com\/wp-content\/uploads\/2025\/05\/Triangular-Omega-Scaffolding2-300x300.jpg 300w, https:\/\/zemanco.com\/wp-content\/uploads\/2025\/05\/Triangular-Omega-Scaffolding2-200x200.jpg 200w, https:\/\/zemanco.com\/wp-content\/uploads\/2025\/05\/Triangular-Omega-Scaffolding2-150x150.jpg 150w, https:\/\/zemanco.com\/wp-content\/uploads\/2025\/05\/Triangular-Omega-Scaffolding2-500x500.jpg 500w, https:\/\/zemanco.com\/wp-content\/uploads\/2025\/05\/Triangular-Omega-Scaffolding2-1024x1024.jpg 1024w, https:\/\/zemanco.com\/wp-content\/uploads\/2025\/05\/Triangular-Omega-Scaffolding2-768x768.jpg 768w, https:\/\/zemanco.com\/wp-content\/uploads\/2025\/05\/Triangular-Omega-Scaffolding2.jpg 1100w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/p>\n<p dir=\"ltr\" style=\"text-align: center\"><a href=\"https:\/\/zemanco.com\/%d8%af%d8%a7%d8%b1%d8%a8%d8%b3%d8%aa-%d8%a7%d9%85%da%af%d8%a7-%d9%85%d8%ab%d9%84%d8%ab%db%8c\/\">Purchase Triangular Shoring<\/a><\/p>\n<p dir=\"ltr\" style=\"text-align: justify\">Hammer scaffolding, with its locking connections and high strength, is a suitable choice for industrial and heavy-duty projects and, alongside metal concrete formwork, ensures structural stability and safety.<\/p>\n<p dir=\"ltr\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-1766 size-medium\" title=\"New-generation hammer scaffolding manufactured by Zaman Company \u2013 hammer scaffolding price\" src=\"https:\/\/zemanco.com\/wp-content\/themes\/woodmart\/images\/lazy.svg\" data-src=\"https:\/\/zemanco.com\/wp-content\/uploads\/2025\/05\/Hammer-scaffolding-300x300.jpg\" alt=\"New-generation hammer scaffolding manufactured by Zaman Company \u2013 hammer scaffolding price\" width=\"300\" height=\"300\" srcset=\"\" data-srcset=\"https:\/\/zemanco.com\/wp-content\/uploads\/2025\/05\/Hammer-scaffolding-300x300.jpg 300w, https:\/\/zemanco.com\/wp-content\/uploads\/2025\/05\/Hammer-scaffolding-200x200.jpg 200w, https:\/\/zemanco.com\/wp-content\/uploads\/2025\/05\/Hammer-scaffolding-150x150.jpg 150w, https:\/\/zemanco.com\/wp-content\/uploads\/2025\/05\/Hammer-scaffolding-500x500.jpg 500w, https:\/\/zemanco.com\/wp-content\/uploads\/2025\/05\/Hammer-scaffolding-1024x1024.jpg 1024w, https:\/\/zemanco.com\/wp-content\/uploads\/2025\/05\/Hammer-scaffolding-768x768.jpg 768w, https:\/\/zemanco.com\/wp-content\/uploads\/2025\/05\/Hammer-scaffolding.jpg 1100w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/p>\n<p dir=\"ltr\" style=\"text-align: center\"><a href=\"https:\/\/zemanco.com\/%d8%af%d8%a7%d8%b1%d8%a8%d8%b3%d8%aa-%da%86%da%a9%d8%b4%db%8c\/\">Hammer Scaffolding<\/a><\/p>\n<p dir=\"ltr\">Service scaffolding is used to provide safe access to different parts of a structure during installation, repair, or maintenance, and is mostly applied in utility and service projects.<\/p>\n<p dir=\"ltr\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-2394 size-medium\" title=\"Service (facade) scaffolding, a cost-effective alternative to traditional scaffolding systems\" src=\"https:\/\/zemanco.com\/wp-content\/themes\/woodmart\/images\/lazy.svg\" data-src=\"https:\/\/zemanco.com\/wp-content\/uploads\/2025\/05\/\u062f\u0627\u0631\u0628\u0633\u062a-\u062e\u062f\u0645\u0627\u062a\u06cc-300x300.jpg\" alt=\"Service (facade) scaffolding, a cost-effective alternative to traditional scaffolding systems\" width=\"300\" height=\"300\" srcset=\"\" data-srcset=\"https:\/\/zemanco.com\/wp-content\/uploads\/2025\/05\/\u062f\u0627\u0631\u0628\u0633\u062a-\u062e\u062f\u0645\u0627\u062a\u06cc-300x300.jpg 300w, https:\/\/zemanco.com\/wp-content\/uploads\/2025\/05\/\u062f\u0627\u0631\u0628\u0633\u062a-\u062e\u062f\u0645\u0627\u062a\u06cc-1024x1024.jpg 1024w, https:\/\/zemanco.com\/wp-content\/uploads\/2025\/05\/\u062f\u0627\u0631\u0628\u0633\u062a-\u062e\u062f\u0645\u0627\u062a\u06cc-150x150.jpg 150w, https:\/\/zemanco.com\/wp-content\/uploads\/2025\/05\/\u062f\u0627\u0631\u0628\u0633\u062a-\u062e\u062f\u0645\u0627\u062a\u06cc-768x768.jpg 768w, https:\/\/zemanco.com\/wp-content\/uploads\/2025\/05\/\u062f\u0627\u0631\u0628\u0633\u062a-\u062e\u062f\u0645\u0627\u062a\u06cc-200x200.jpg 200w, https:\/\/zemanco.com\/wp-content\/uploads\/2025\/05\/\u062f\u0627\u0631\u0628\u0633\u062a-\u062e\u062f\u0645\u0627\u062a\u06cc-500x500.jpg 500w, https:\/\/zemanco.com\/wp-content\/uploads\/2025\/05\/\u062f\u0627\u0631\u0628\u0633\u062a-\u062e\u062f\u0645\u0627\u062a\u06cc.jpg 1100w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/p>\n<p dir=\"ltr\" style=\"text-align: center\"><a href=\"https:\/\/zemanco.com\/%d8%af%d8%a7%d8%b1%d8%a8%d8%b3%d8%aa-%d8%ae%d8%af%d9%85%d8%a7%d8%aa%db%8c\/\">Service Scaffolding<\/a><\/p>\n<p dir=\"ltr\">Traditional scaffolding, composed of pipes and couplers, offers high flexibility in execution and is still used in projects with special geometries or limited space.<\/p>\n<p dir=\"ltr\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-2427 size-medium\" title=\"Traditional pipe-and-coupler scaffolding is more than a set of metal components; it is a common language and an art in the construction industry.\" src=\"https:\/\/zemanco.com\/wp-content\/themes\/woodmart\/images\/lazy.svg\" data-src=\"https:\/\/zemanco.com\/wp-content\/uploads\/2025\/05\/\u062f\u0627\u0631\u0628\u0633\u062a-\u0633\u0646\u062a\u06cc3-300x300.jpg\" alt=\"What is traditional scaffolding? Traditional pipe-and-coupler scaffolding is more than a set of metal components; it is a common language and an art in the construction industry.\" width=\"300\" height=\"300\" srcset=\"\" data-srcset=\"https:\/\/zemanco.com\/wp-content\/uploads\/2025\/05\/\u062f\u0627\u0631\u0628\u0633\u062a-\u0633\u0646\u062a\u06cc3-300x300.jpg 300w, https:\/\/zemanco.com\/wp-content\/uploads\/2025\/05\/\u062f\u0627\u0631\u0628\u0633\u062a-\u0633\u0646\u062a\u06cc3-1024x1024.jpg 1024w, https:\/\/zemanco.com\/wp-content\/uploads\/2025\/05\/\u062f\u0627\u0631\u0628\u0633\u062a-\u0633\u0646\u062a\u06cc3-150x150.jpg 150w, https:\/\/zemanco.com\/wp-content\/uploads\/2025\/05\/\u062f\u0627\u0631\u0628\u0633\u062a-\u0633\u0646\u062a\u06cc3-768x768.jpg 768w, https:\/\/zemanco.com\/wp-content\/uploads\/2025\/05\/\u062f\u0627\u0631\u0628\u0633\u062a-\u0633\u0646\u062a\u06cc3-200x200.jpg 200w, https:\/\/zemanco.com\/wp-content\/uploads\/2025\/05\/\u062f\u0627\u0631\u0628\u0633\u062a-\u0633\u0646\u062a\u06cc3-500x500.jpg 500w, https:\/\/zemanco.com\/wp-content\/uploads\/2025\/05\/\u062f\u0627\u0631\u0628\u0633\u062a-\u0633\u0646\u062a\u06cc3.jpg 1100w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/p>\n<p dir=\"ltr\" style=\"text-align: center\"><a href=\"https:\/\/zemanco.com\/%d8%af%d8%a7%d8%b1%d8%a8%d8%b3%d8%aa-%d8%b3%d9%86%d8%aa%db%8c\/\">Traditional Scaffolding<\/a><\/p>\n<h2 dir=\"ltr\">5 Golden Tips for Identifying High-Quality Metal Concrete Formwork<\/h2>\n<p dir=\"ltr\">When you receive the formworks, how can you be sure you have not been misled?<\/p>\n<ol dir=\"ltr\">\n<li><strong>Check the ribs:<\/strong> The ribs around the formwork must be perfectly square. If the formwork is not a perfect rectangle, gaps will open during assembly, allowing concrete slurry to leak out.<\/li>\n<li><strong>Punching quality:<\/strong> Pin and wedge holes must be precise and free of burrs. If the punching is not standard, pins and wedges will be difficult to insert, causing inconvenience for your workers during installation.<\/li>\n<li><strong>Surface flatness:<\/strong> The facing sheet must not have any waviness. Place a metal straightedge on the surface to ensure it is perfectly flat.<\/li>\n<li><strong>Painting:<\/strong> Although paint alone is not an indicator of quality, formworks that are oven-painted or dip-coated are more resistant to corrosion.<\/li>\n<li><strong>Random weighing:<\/strong> Select several formworks at random and weigh them. The weight should correspond to the table provided by the seller (within a small tolerance).<\/li>\n<\/ol>\n<p dir=\"ltr\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-2825 size-full\" title=\"To identify high-quality metal concrete formwork, pay attention to the thickness and grade of the steel sheet; uniform sheets without waviness indicate higher quality. Clean, consistent, and crack-free welding plays a key role in the durability of the formwork. Checking the strength of the ribs and punchings, the flatness of the formwork surface, and the presence of an appropriate anti-rust coating are also essential points. High-quality formwork does not deform under concrete pressure and has a longer service life.\" src=\"https:\/\/zemanco.com\/wp-content\/themes\/woodmart\/images\/lazy.svg\" data-src=\"https:\/\/zemanco.com\/wp-content\/uploads\/2025\/12\/3-2.jpg\" alt=\"Golden tips for identifying high-quality metal concrete formwork\" width=\"1920\" height=\"1080\" srcset=\"\" data-srcset=\"https:\/\/zemanco.com\/wp-content\/uploads\/2025\/12\/3-2.jpg 1920w, https:\/\/zemanco.com\/wp-content\/uploads\/2025\/12\/3-2-300x169.jpg 300w, https:\/\/zemanco.com\/wp-content\/uploads\/2025\/12\/3-2-1024x576.jpg 1024w, https:\/\/zemanco.com\/wp-content\/uploads\/2025\/12\/3-2-768x432.jpg 768w, https:\/\/zemanco.com\/wp-content\/uploads\/2025\/12\/3-2-1536x864.jpg 1536w, https:\/\/zemanco.com\/wp-content\/uploads\/2025\/12\/3-2-500x281.jpg 500w, https:\/\/zemanco.com\/wp-content\/uploads\/2025\/12\/3-2-150x84.jpg 150w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/p>\n<p dir=\"ltr\">\n<h2 dir=\"ltr\">Frequently Asked Questions (FAQ)<\/h2>\n<h3 dir=\"ltr\">1. Is it possible to ship formwork to other cities?<\/h3>\n<p dir=\"ltr\">Yes, Beton Sazeh Zaman Company provides daily loading and shipping to all parts of Iran (from Tehran to the southern and western regions of the country) at the lowest possible freight cost.<\/p>\n<p dir=\"ltr\">\n<h3 dir=\"ltr\">2. What is the service life of metal concrete formwork?<\/h3>\n<p dir=\"ltr\">With proper maintenance (oiling before concreting, avoiding dropping from height, and appropriate storage), new Zaman formworks can be used for more than 50 concreting cycles without issues.<\/p>\n<p dir=\"ltr\">\n<h3 dir=\"ltr\">3. What is the difference between welded ribs and pressed ribs?<\/h3>\n<p dir=\"ltr\" style=\"text-align: justify\">In welded-rib (welded-edge) formworks, the ribs are welded separately to the sheet, providing very high strength. In pressed (bent) models, the sheet is bent from a single piece. For heavy-duty projects, the welded-rib model\u2014which is our area of expertise\u2014is recommended.<\/p>\n<p dir=\"ltr\">\n<h3 dir=\"ltr\">4. Is installment or post-dated check payment available?<\/h3>\n<p dir=\"ltr\">Payment terms vary depending on order volume and customer credit status. To learn about special credit sales conditions for certified contractors, please contact Zaman\u2019s accounting department.<\/p>\n<p dir=\"ltr\">\n<h2 dir=\"ltr\">Conclusion and Purchasing Guide from Zaman<\/h2>\n<p dir=\"ltr\" style=\"text-align: justify\">Purchasing concrete formwork means purchasing your working tools. The more precise your tools are, the cleaner and more professional your structural output will be. At the Zaman website, we are committed to delivering products made with standard alloys and precise geometry.<\/p>\n<p dir=\"ltr\" style=\"text-align: justify\">To receive an instant pro forma invoice and free consultation regarding the number of formworks required for your drawings, contact our engineers right now or send your list via WhatsApp.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>In the modern construction industry, cost management is one of the most challenging responsibilities for project managers and contractors. Since<\/p>\n","protected":false},"author":2,"featured_media":2833,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[56],"tags":[],"class_list":["post-3095","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-articles"],"acf":[],"_links":{"self":[{"href":"https:\/\/zemanco.com\/en\/wp-json\/wp\/v2\/posts\/3095","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/zemanco.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/zemanco.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/zemanco.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/zemanco.com\/en\/wp-json\/wp\/v2\/comments?post=3095"}],"version-history":[{"count":0,"href":"https:\/\/zemanco.com\/en\/wp-json\/wp\/v2\/posts\/3095\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/zemanco.com\/en\/wp-json\/wp\/v2\/media\/2833"}],"wp:attachment":[{"href":"https:\/\/zemanco.com\/en\/wp-json\/wp\/v2\/media?parent=3095"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/zemanco.com\/en\/wp-json\/wp\/v2\/categories?post=3095"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/zemanco.com\/en\/wp-json\/wp\/v2\/tags?post=3095"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}